Month: May 2020

How are we coping after MCO

After closing for a 2 months. We resume operation on 13th of May. 1. Some orders were cancelled Most construction sites was brought into a halt. We received cancelled PO on the first few days of business. 2. Higher operating cost Even though oil price drops, we spent thousands of dollars on sanitizing and health

Segmental Launching Gantry

Segmental Launching Gantry is generally used in the erection of  Highway Bridge and MRT Bridge, using precast segmental pre-stress concrete box beam (PC beam) assembly. The main feature is the high efficiency of self-travelling construction. It’s composed of the main beam, leg and winch trolley. The main girder is used for bearing load, the leg is

Road Building in Malaysia

How far is 10 kilometers? How far is 10 kilometers? If you ever want to find that out, I suggest you to run a marathon or set the distance on the treadmill. It’s quite a big deal for me personally. And then we are going to add a few zeros behind the 10km you’ve run.