We fabricate casting mould incorporating a 225 mm VCP (Vitrified Clay Pipe) pipe at the bottom. The mould was designed specifically to use with precast chambering, allowing the concrete to be formed accurately while accommodating the pipe connection at the base.

Designed for the Casting Requirement

While setting up, worker positions the 225 mm VCP pipe at the bottom of the mould as part of the final cast structure. Rather than using a conventional mould configuration, the mould was fabricated around the pipe dimensions to ensure proper alignment and a clean interface during casting.

This type of arrangement is particularly useful when the finished concrete component needs to incorporate a pipe opening or connection directly into the casting.

Custom Fabrication

The mould was fabricated to suit the required dimensions and site application. Key considerations during fabrication included:

  • Accurate positioning of the 225 mm VCP pipe
  • Proper alignment between the pipe and mould
  • Sufficient rigidity to maintain the mould shape during casting
  • Easy access for concrete placement and subsequent demoulding
  • A suitable surface finish to help achieve a consistent cast
casting mould with VCP

Custom mould fabrication allows the design to be adjusted according to the actual project requirements instead of forcing the application to fit a standard mould.

From Fabrication to Casting

A well-designed mould is more than just a temporary enclosure for concrete. The geometry, pipe positioning, rigidity and accessibility all affect the quality of the final cast component.

For this project, the 225 mm VCP pipe was integrated directly into the mould arrangement, creating a practical setup for producing the required concrete form.

At One Machine Engineering, we provide custom fabrication solutions for industrial and construction applications, including moulds, frames, tanks, structural steelwork and other project-specific fabrication works.


Contact us with your required dimensions, drawings or application details, and we can develop a fabrication solution around your requirements.

sewerage casting mould chambering VCP

Casting Mould with VCP opening

One Machine Engineering Sdn Bhd (HOMEPAGE)
No 28, Jalan TPP 5/10, Taman Perindustrian Puchong, 47100 Puchong, Selangor Darul Ehsan.
Email: liew.onemachine@gmail.com
Tel: 03 8051 8761
Whatsapp: 016 9159608 (Ms Liew)

Leave a Reply

Your email address will not be published. Required fields are marked *