Year: 2026

Concrete Distributor (Spider) for Efficient High-Rise Concrete Placement

We fabricate spider concrete distributor here at Taman Perindustrian Puchong, Selangor. In high-rise construction projects, efficient concrete placement is essential to maintain productivity and ensure quality workmanship. One piece of equipment that significantly improves the concrete pouring process is the concrete distributor, commonly known on construction sites as a spider. To use with concrete pump A concrete

Ratchet Lifting Rack

We fabricate ratchet rack lifting gear here at Taman Perindustrian Puchong. This lifting mechanism uses a ratchet and rack system that allows loads to be lifted step-by-step with stability and precision. The manual crank operation makes it practical for workshops, maintenance environments, fabrication work, and industrial handling where controlled movement is important. With its heavy-duty

8″ Layflat hose @ Puchong

We supply 8″ PVC layflat Fabric Hose here at Taman Perindustrian Puchong. When it comes to reliable water transfer in industrial and construction environments, a 200mm fabric hose made from PVC and high-strength polyester filament offers an excellent balance of durability and practicality. Designed as a lay-flat hose, it combines a tough woven outer jacket

200mm PVC Fabric Hose @ Puchong

PVC Fabric Hose at Taman Perindustrian Puchong. When it comes to reliable water transfer in industrial and construction environments, a 200mm fabric hose made from PVC and high-strength polyester filament offers an excellent balance of durability and practicality. Designed as a lay-flat hose, it combines a tough woven outer jacket with a smooth PVC inner

Mall Work Permits

Understanding Electrical Submission Requirements for Mall Work Permits When carrying out electrical works in commercial buildings such as shopping malls, contractors are typically required to submit a set of technical documents before a work permit is approved. These requirements ensure that all installations are properly designed, safe, and compliant with local regulations. Commonly requested documents

Auger Flight Fabrication @ Puchong

Custom Auger Flight Fabrication at Puchong We fabricate auger flight here in Taman Perindustrian Puchong. Auger flights are critical components in many industries, including agriculture, mining, construction, wastewater treatment, and bulk material handling. The performance of an auger system depends heavily on the accuracy, strength, and consistency of its flight fabrication. Professional auger flight fabrication

Forklift tipping bin @ Puchong

Forklift Dumpster / Forklift Dumping Hopper Designed and made here in Taman Perindustrian Puchong, our forklift dumpster, also known as a forklift dumping hopper, forklift tipping bin, or self-dumping hopper, is designed to improve efficiency and safety in industrial and construction environments. This hopper is equipped with two heavy-duty bearings on each side, allowing it

Forklift Dumpster @ Puchong

Forklift Dumpster / Forklift Dumping Hopper Designed and made here in Taman Perindustrian Puchong, our forklift dumpster, also known as a forklift dumping hopper, forklift tipping bin, or self-dumping hopper, is designed to improve efficiency and safety in industrial and construction environments. This hopper is equipped with two heavy-duty bearings on each side, allowing it

Concrete Drum Mixer @ Puchong

Heavy-Duty Concrete Mixer for High-Performance Construction One Machine Engineering Sdn Bhd proudly offers a heavy-duty 3.0m³ and above concrete mixer, designed to meet the needs of modern construction projects. Inspired by KYB-style truck mixers, this machine delivers reliable, consistent, and efficient concrete mixing for medium to large-scale operations. The mixer features a robust drum structure

Common Electrical Test

Electrical Relay Calibration Services (OC & EF Relays) Borang H We provide professional inverse time overcurrent (OC) and earth fault (EF) relay calibration services for land-based electrical systems. Our team ensures that each relay is accurately tested, verifying trip times and current settings to meet design and safety requirements. The calibration process typically takes 30 minutes to 3 hours, depending