Safety Man Cage Fabrication in Kuala Lumpur (Puchong) Also known as first aid man cage, crane cage, We fabricate and supply safety man cage here in Kuala Lumpur, Malaysia. Safety cage is a requirement where emergency happens, injured workers can be lifted from construction site or tunnels. We design and manufacture safety man cage in
Sludge dewatering is one of the technique used in sewerage treatment plant. The final products are dried, treated sludge in powdered form. We fabricate roro bin for sewerage treatment plant in Malaysia. The body is using 2.5mm m.s. steel plate for extra life span. Rorobin for Sludge Waste Capacity Dimension 10 ton L 7.5 ft x
We fabricate lifting cage with loading ramp here in Puchong, Malaysia. The ramp closes with a spring on both edges, acting as an auto safety lock. 1. Forklift friendly The cage is 5 inches lifted from the ground for easy forklift mask scooping. 2. Four nos of lifting eyes Four nos of 12mm lifting eyes
We supply concrete shut-off valve here in Puchong, Malaysia. 1. Why do we need concrete stopper? We all know how it a concrete pump works. It pumps concrete from ground floor to the constructing floor, may it be 30th floor, or 46th floor. When we’re done with all the pumping and casting, there will be
Also known as V Bucket, ditching bucket, drain bucket, V ditch bucket here at Taman Perindustrian Puchong. Excavator trenching bucket is a useful attachment when the builder need to build drainage in great length. We supply custom made trenching bucket for builders in Malaysia. Understanding the Trenching Bucket: A Versatile Excavator Tool A trenching bucket,
There are often waste from platform plate, scaffolding, or general waste to be transported from construction floor to the ground. Construction Waste Bin with lifting eyes is suitable for carrying such bulky waste. These wastes weight less than sand and cement and are larger in volume. Therefore we had our engineer team design waste bin
As tower crane is improving their design, we saw more and more demand for heavier duty concrete bucket. Our site project manager has began to ditch their old 0.5m3 and 1.0m3 and opt for 1.5m3 and 2.0m3. Concrete Bucket above 1m3 will not have the triangle hook, it comes with lifting eyes instead. Plate Thickness
We fabricated a set of casting mold for Forest City, Johor, Malaysia in early 2020. The manhole is 2100mm in diameter and ground level to invert level of ouoe us 5 < D < 9 meter Back drop which is where the opening located is around 600mm. Gallery Internal Casting Mould We also fabricated casting
After closing for a 2 months. We resume operation on 13th of May. 1. Some orders were cancelled Most construction sites was brought into a halt. We received cancelled PO on the first few days of business. 2. Higher operating cost Even though oil price drops, we spent thousands of dollars on sanitizing and health
Segmental Launching Gantry is generally used in the erection of Highway Bridge and MRT Bridge, using precast segmental pre-stress concrete box beam (PC beam) assembly. The main feature is the high efficiency of self-travelling construction. It’s composed of the main beam, leg and winch trolley. The main girder is used for bearing load, the leg is